Gain access to a collection of home building information from installation protocols (in both English and Spanish) to Title-24 inspection forms.

HVAC Design Guideline

Energy-Efficient HVAC Systems

Building Envelope

Air Sealing (Spanish)
Caulking and sealing guidelines to reduce air infiltration

HVAC (Spanish)
Heating, ventilating, and air conditioning design and installation guidelines

Insulation (Spanish)
Scope of work for quality installation of insulation

Window Installation (Spanish)
Guidelines for installation of windows with integral mounting flange in wood frame construction

Sliding Glass Door Install (Spanish)
Guidelines for installation of sliding glass doors with integral mounting flange in wood frame construction

Thermal Bypass Inspection Checklist
A 16-point checklist of building details to help reduce thermal bypass or movement of heat around or through insulation (a requirement of Energy Star homes)

California Quality Insulation Installation and Thermal Bypass Checklist
The requirements for California are found on pages 7 and 8 of the current CF4R. In California the Thermal Bypass Checklist and Quality Insulation Installation are combined.

Ventilation Protocol
Procedures for residential mechanical ventilation

Recycling

Recycling Protocols
In-depth step by step guide to on-site recycling

Recycling Protocols Steps
Abbreviated step by step guide to on-site recycling

Solar Electric

Photovoltaic Introduction
Introduction to procedures for solar electric-photovoltaic-system design and installation

Photovoltaic Background
Background information on benefits, components, types, options, output estimation, typical prices, incentives warranties, project coordination, and customer education

Photovoltaic Scope of Work
Procedures for solar electric-photovoltaic-system design and installation

Photovoltaic Checklist
Solar electric-photovoltaic-system installation check list

California Title-24 Required Inspection Forms

This appendix includes blank copies of the Residential Compliance Forms. Compliance documentation is completed at the Building Permit Phase, the Construction Phase, and the Field Verification and Diagnostic Testing Phase. The forms and documents submitted at each of these phases are described below.

Building Permit Phase Documentation
The Standards Section 10-103(a) requires that a certificate of compliance be included on the plans when the performance approach is used. If the performance approach is utilized for compliance, the CF-1R forms are produced by the compliance software. Thermal Mass and Solar Heat Gain Coefficient calculations are performed internally by the software.

Certificate of Compliance - Residential New Construction (CF-1R)
The CF-1R summarizes the minimum energy performance specifications needed for new construction compliance, including HVAC capacity and the results of the heating and cooling load calculations need to be to be attached. The Standards require that a certificate of compliance be included on the plans. CEC approved Performance ACM software automatically generates CF-1R forms, which vary in some respects from the prescriptive CF-1R forms.

Certificate of Compliance - Residential Additions (CF-1R-ADD)
The CF-1R-ADD summarizes the minimum energy performance specifications needed to demonstrate compliance for an addition to a dwelling, including HVAC capacity and the results of the heating and cooling load calculations which are required to be attached. The Standards require that a certificate of compliance be included on the plans. CEC approved performance ACM software automatically generates CF-1R forms, which vary in some respects from the prescriptive CF-1R forms.

Certificate of Compliance - Residential Alterations (CF-1R-ALT)
The CF-1R-ALT summarizes the minimum energy performance specifications needed for an alteration to an existing dwelling, including HVAC capacity and the results of the heating and cooling load calculations need to be attached. The Standards require that a certificate of compliance be included on the plans. CEC approved performance ACM software automatically generates CF-1R forms, which vary in some respects from the prescriptive CF-1R forms.

Mandatory Measures List (MF-1R)
This document is applicable for both prescriptive and performance compliance. This reference list must be part of the building plans to help builders and inspectors reference applicable mandatory measures in the Standards.

Solar Water Heating Calculation (CF-SR)
This form is used to calculate the percent of domestic water heating that is supplied by solar water heating. The form is used to calculate the percent of solar contributed by tested solar system. All system or collector data must be based on the OG-300 test methods of the Solar Rating and Certification Corporation. This form is only available in electronic (Excel) format. Contact the Energy Commission Hotline for more information on how to access this calculation sheet.

Thermal Mass Worksheet (WS-1R)
This worksheet is completed by the documentation author when complying with the prescriptive requirements of Package C.

Area Weighted Average Calculation Worksheet (WS-2R)
This worksheet is used to calculate weight-averaged U-factors for prescriptive envelope compliance.

For single forms, click the following.